Kitchen & Bathroom Remodeling Services in NJ

KV Home Improvement knows how crucial your kitchen is to your regular family routine and social engagement. When in the kitchen, the priority is to create incredible dishes and enjoy yourself while entertaining guests. We mirror the effort put into being the perfect host, with the effort we put into creating the perfect kitchen for New Jersey homeowners.

A gourmet dish requires the best ingredients; the same goes for kitchen remodels. Kitchen countertops, flooring, cabinets, appliances, plumbing, and the overall design are all crucial parts that blend to create your finished project. From small kitchen remodels to complete custom kitchens, KV Home Improvement commits to using the highest quality materials within your budget to bring your dream kitchen to life.

At KV Home Improvement our desire is to provide the highest level of craftsmanship into every customer piece we produce, whether it is a vanity for a home or a grand registration desk for a luxury hotel.

Designing a new kitchen is a fun and thrilling experience if you have the proper professional help. Our design experts can help you select the perfect products and services to get the most out of your kitchen space. We consider all the factors of your life before making suggestions for what would be best for your home. Some of the factors we keep in mind are:

Bathroom Remodeling

From master bathrooms to guest bathrooms, KV Home Improvement will help you bring your dream bathroom to life. As one of the most used rooms in the house, bathrooms are a place to energize for the day ahead as well as relax and unwind at the end of the day.

Specializing in bathroom design and remodel, we have helped New Jersey homeowners renovate their bathrooms for over 10 years. From first time home buyers needing a complete bathroom remodel to homeowners looking for a modern bathroom makeover, our team of expert bathroom designers and contractors are here to help.

Most Asked Question.

At the risk of sounding elusive, we really must say that “it depends.” The scope of the kitchen remodeling dictates how long the project will take. For example, if you are removing a wall or two to open up the kitchen, which is a very common trend now, the actual construction will obviously take a little bit longer. But, it is important to remember that removing or adding walls will generally require building department permits, which will also add to the project time.

  1. Here’s a sample timeline, for illustration purposes only, of a kitchen remodeling project that does not include removing or adding walls:
  2. Meet with a remodeling consultant for a Free Design Consultation and get proposal – 1 week.
  3. Meet at our showroom, finalize the scope of the project and the terms of a Remodeling Agreement – 2 to 3 weeks.
  4. Select all the materials for the project – 1 to 4 weeks.
  5. Materials are ordered and delivered – 4 to 8 weeks.
  6. Demolition and removal of old materials and appliances – 1 week.
  7. Installation of new materials and appliances, flooring, plumbing and electrical work, painting – 3 to 4 weeks.
  8. Finishing touches and clean up – 1 to 2 weeks.

  1. Select your remodeler
  2. Create design
  3. Select and Order materials
  4. Building approval
  5. Demolition
  6. Deliver materials to the apartment
  7. Rough electric
  8. Rough plumbing
  9. Wall preparation
  10. Sub floor preparation
  11. Flooring installation
  12. Cabinet installation
  13. Locating appliances
  14. Countertop template
  15. Priming and painting
  16. Countertop installation
  17. Backsplash installation
  18. Finish plumbing – dishwasher, Sink and faucet installation
  19. Appliance installation
  20. Accessories installation
  21. Door hardware installation
  22. Finish electric – Light fixtures, outlets, under cabinets…
  23. Touch up items

At the risk of sounding elusive, we really must say that “it depends.” The scope of the bathroom remodeling dictates how long the project will take. For example, if you are relocating your fixtures and reconfiguring the room, the actual construction will obviously take a little bit longer. But, it is important to remember that moving fixtures will generally require building department permits, which will also add to the project time.

Here’s a sample timeline, for illustration purposes only, of a bathroom remodeling project that does not include relocating fixtures:

  1. Meet with a remodeling consultant for a Free Design Consultation and get proposal – 1 week.
  2. Meet at our showroom, finalize the scope of the project and the terms of a Remodeling Agreement – 2 to 3 weeks.
  3. Select all the materials for the project – 1 to 4 weeks.
  4. Materials are ordered and delivered – 3 to 6 weeks.
  5. Demolition and removal of old materials and appliances – 1 week.
  6. Installation of new materials and appliances, flooring, plumbing and electrical work, painting – 2 to 3 weeks.
  7. Finishing touches and clean up – 1 to 2 weeks.

Depending on your style and taste, the floor and wall tiles can be the most expensive. Other possibly considerable expenses are the fixtures and shower system.